Texas Board of Professional Engineers

Austin, TX

General Contractor:  CORZA Construction

Project:  Concrete Stairs and Landings Repair & Resurfacing

​

This project was for a repair and resurfacing of approximately 3,500 square feet of concrete stairs and landings. The client had issues in the past with the surface of the stairs being slippery, especially when it’s wet. Therefore, CORZA Construction removed 1 inch to 1-1/2” inch of the 20+ year-old concrete surface. We placed new concrete and applied a broom finish which provided a rough surface and greatly decreases the chances of slipping while traveling up and down the stairway.

Cinemark Tinseltown 20 & XD

Pflugerville, TX

General Contractor:  TMS Construction

Project:  Movie Theater Renovation 

 

The Cinemark Tinseltown was built in 1997 which makes over 20 years of operation within the Austin area. This project consists of remodeling the 20 theatres which totaled approximately 25,000 square feet in 3 phases. Phase 1: 8 theatres, Phase 2: 6 theatres, Phase 3: 6 theatres. CORZA Construction performed all concrete work which included 60+ new ADA ramps, 50+ sets of stairs, landings, and a 1,000 square foot stage and raised slabs from the existing foundation using Expanded Polystyrene (EPS) foam, which acts as a void filler and is known to be a cost saver, provides constant thermal resistance and is highly rated

for energy efficiency.

AT&T Center

San Antonio, TX

General Contractor:  Skanska

Project:  AT&T Center Restroom Remodel

 

Corza Construction performed painting, tape & float (drywall), drywall patching, installation of Phenolic Restroom Partitions and saw cut (concrete) the floor drains for 63 restrooms located throughout all 5 levels of the sports and entertainment facility prior to the start of the 2016-2017 San Antonio Spurs basketball season. Along with Skanska, Corza worked a very tight and tedious schedule using the Critical Path Method (CPM) and the Lean Method for both phase 1 and phase 2. The project lasted 2.5 months (1st week of August 2016 –  2nd week of October 2016)

VA Medical Hospital

Kerrville, TX

General Contractor:  Hernandez Consulting, LLC

Project:  KVAMC Pharmacy Renovation

 

Corza Construction performed various jobs at the site such as several concrete slabs pours, brick masonry installation, wall demolitions, concrete parapet wall installation and CMU walls with plaster application. Currently, Corza is working phase 1 of the project which encompasses the build out of an abandoned area located next to the existing pharmacy. There will be a new vault room which will house the medications, a new mechanical room, offices, a waiting room and a reception room. Once phase 1 is completed, then a transitional period of 20 days will take place. This will involve moving into the new pharmacy from the old pharmacy. Once that is completed, then phase 2 will begin with remodeling of the old pharmacy. Once phase 2 is completed, both areas will be adjoined and the project will be 100% complete.

  • CORZA Construction Facebook Profile
  • CORZA Construction Instagram Profile
  • CORZA Construction Linkedin Profile

Copyright © 2021 CORZA Construction, LLC. | Austin, Texas | Minority-owned HUB & DBE Certified Company | All Rights Reserved

bottom of page